1. Jira YIS for Agile software development

Project YIS is set up as a single space to allow Information Systems to align on an Agile way of working, as part of the Agile Transformation.

Together we strive to arrive at a Jira configuration that is usable for all teams, supporting all YME Information Systems processes in a comprehensive, simplified manner.

Issuetypes

Issuetypes have a hierarchy to them:

Items in YIS project build on the Programmes or Projects created in YPM. An Epic should always be linked to one of these, so it is clear which strategic initiative it's part of.

An Epic is a large feature, that is broken down into its component Stories by a scrum team.

Story is a feature that can be tested separately, and is part of an Epic.

Sub-task is an activity that needs to be performed to complete a higher-level issuetype. It's always part of another issuetype.

At the same level as Story, other Product Backlog Items exist with slightly different meanings:

A Bug is a broken feature found outside of sprint;

A Change Request is a change to an existing feature, requested during UAT;

A Defect is a broken feature found during UAT;

A Spike is a Proof of Concept or other research required to prove the feasibility of a solution;

A Task is a Non-Functional Requirement, work in software development that brings no value to business yet is necessary (for example: code refactoring).

For testing using addon Xray, the following issuetypes exist. These are used solely by testers, to plan their work:

A Precondition describes the correct starting point of the test case. It can be a user's configuration; or a required object status, "with product _1" for example; or some permission that needs to be set before a test case is run.

A Test describes a single test scenario;

A Test Execution reports the execution of a Test;

A Test Plan is a container for test cases, usually related to a single sprint.

A Test Set collects Tests that logically belong together, so they can easily be resused, for example for planning of UAT.

Workflows

This project contains three workflows, with the distinction being made whether an item contains a software release (development workflow) or not (four step workflow).

Epics have three additional statusses for Product Owners to prepare the work:

Field configuration

Yamaha Teams

Fix/version

When closing an item, you are often prompted to fill in the mandatory field for Fix/Version.

Jsox compliance


2. Smart use of YIS

DOR

Card colours

PO boards


3. Other projects for software development