Introduction Xray


Issue types used for Testing:


Test

Test should be created within the ticket of a story. It represents one test case, with one or more steps. A story should have at least one Test linked to it, but it could be more depending on the story. These Tests should be added to a Test Plan at the start of a sprint. A Test also has different statusses:

  1. BackLog: added to a story but not yet defined
  2. To Do: the sprint has started, the requirements are clear, so the Test could be picked up to create the test steps, even if development has not yet started
  3. In Progress: the story is being developed or even development is done. The Test should be created and defined. Steps should be described and the expected results should be clear 
  4. Done: the Test itself is finished and ready to be executed as soon as the development of the story is done and reviewed and the ticket is set on 'Ready for test"

The Test itself should not be linked to a sprint, but the Test Plan of which this test is a part of should be.

The naming of the Test should reflect the naming of the corresponding story, but edited with the word "Test" as to make clear this is specially for testing. For example, if the title of the story is "Improve the interface" the Test should be named "Test Improve the interface"

Pre- Condition

Pre-Conditions are generic steps that are not necessarily part of the actual Test case, but mostly used as some setup conditions before the real Test can start. These steps are reusable and may be linked to multiple steps. These pre condition should never be linked to any sprint.

Test Plan

To be created at the start of each sprint and linked to that sprint. It is just needed to create an empty Test Plan, which can be filled with Tests created for each story in the sprint. The name should reflect the naming of the sprint, for example "DMS Test Plan sprint 1", "DMS Test Plan sprint 2" etc.

Test Set

A Test Set is a collection of Tests that can be linked to each other for organizing purposes. These can be matched by subject or a specific part of the application. Using Test Sets can make looking up and re-using existing tests more easy and manageable. A Test can be linked to multiple Test Sets. It should be clear by naming the Test Set what the common factor of these Tests are, for examle "Test Set - parts master interface (DLITMPRT)" for all Tests regarding the parts master interface, regardless which story. A Test Set should not be linked to any sprint.

Test Execution 

Just like a Test Plan should a Test Execution always be linked to a sprint. Ideally the Test Execution should contain all Tests for every story in the current sprint. At this point just one Test Execution ticket is created for executing all Tests. It is possible to create that Test Execution ticket from the Test Plan ticket:

From the Test Execution it is clear which Tests has been executed, either successfully or not, and which Tests are still to be executed. Where the Test Plan is within the initial phase of the sprint, the Test Execution should be at the the end of the sprint after the story has been developed and the according Tests have been created.

The naming of this Test Execution ticket should have a link to the sprint just like the Test Plan. Example: for Test Plan of sprint 1 it should be something like "Test Execution for Test Plan Sprint 1". At a later stage it could be more preferable to have more Test Execution tickets.

Sub Test Execution 



Repositories (PreRequisites)

Do we need / want repositories. If yes, what status, what naming convention etc. 



Xray Workflow



Xray: Testing Process workflow within the Sprint

Step by step guide

  1. When the new Sprint is started TM creates Test Plan for this sprint in Jira

TM creates Tests (issue type) for all stories included into Sprint and associates them with Test Plan.

Tests should be created from the story:



2. When Tester starts work with the story, he/she creates Test Design for the story within the associated Test 


Tester add test steps with all necessary data and Expected Results


3. The development is done and story is deployed for testing, Tester goes to the story and creates Test Execution for the newly created Test


4. To start test execution click  icon "View runs"  from the Story:


or click on "Execute in" in Test issue:


Test run will open in a new tab.


(warning) If you don't see the "View runs" icons in the Story, open the Test, scroll down to Executions. There is a Play (Run) button near each execution.

Click it and select Execute:


(star) Please note: to be able to run the execution, it should be assigned to you. Otherwise you will not see the Execute button.


5. Tester executes all steps manually on test env and set the status for each step (Pass/Fail) within created Test Execution 

Bugs should be associated with test step if found


6. Each Test Execution should be added to Test Plan by Tester


7. If bug was found and test step is failed, new Test Execution should be created after bug fix. Steps 3-6 should be repeated

8. Test is completed when all test steps are green for latest Test Execution

Boards


XRAY Test Plan Board

Planning per sprint


Jira Project Board YIS- All test products

Issue type visible on board: Plan and Plan Execution

Use Switch sprint at the top to filter on a specific sprint.