Issue types used for Testing:

Test


Test Execution

“Test execution” is used for a task for executing a test or a group of tests on a given version and environment of the system.

  • Contains a list of tests and their results
  • Can be labeled, prioritized, assigned to testers etc.
  • Can be created manually or during Continuous Integration

Sub Test Execution


Test Plan

When? How? Naming convention. Status updates ISSUE etc. Set the best practice and min requirements.

Test Set

When? How? Naming convention. Set the best practice and min requirements. 

Pre conditions before testing

Abstract initial steps that mast be ensured before starting the test.

  • Manual or Automated (mapped to background clause in case of Cucumber)
  • Reusable - may be linked to multiple Tests


Repositories (PreRequisites)

Do we need / want repositories. If yes, what status, what naming convention etc. 



Xray Workflow



Xray: Testing Process workflow within the Sprint

Step by step guide

  1. When the new Sprint is started TM creates Test Plan for this sprint in Jira

TM creates Tests (issue type) for all stories included into Sprint and associates them with Test Plan.

Tests should be created from the story:



2. When Tester starts work with the story, he/she creates Test Design for the story within the associated Test 


Tester add test steps with all necessary data and Expected Results


3. The development is done and story is deployed for testing, Tester goes to the story and creates Test Execution for the newly created Test


4. To start test execution click  icon "View runs"  from the Story:


or click on "Execute in" in Test issue:


Test run will open in a new tab.


(warning) If you don't see the "View runs" icons in the Story, open the Test, scroll down to Executions. There is a Play (Run) button near each execution.

Click it and select Execute:


(star) Please note: to be able to run the execution, it should be assigned to you. Otherwise you will not see the Execute button.


5. Tester executes all steps manually on test env and set the status for each step (Pass/Fail) within created Test Execution 

Bugs should be associated with test step if found


6. Each Test Execution should be added to Test Plan by Tester


7. If bug was found and test step is failed, new Test Execution should be created after bug fix. Steps 3-6 should be repeated

8. Test is completed when all test steps are green for latest Test Execution

BOARDS


XRAY Test Plan Board

Planning per sprint


Jira Project Board YIS- All test products

Issue type visible on board: Plan and Plan Execution

Use Switch sprint at the top to filter on a specific sprint.

  • No labels